Gallery

Crews, rigs
and crossings

Equipment, crews at work, and utility crossings underway.

  • A well-established bore hole, ready for the pull
    A well-established bore hole, ready for the pull
  • Crew making a connection down in the pit
    Crew making a connection down in the pit
  • Open pit secured before leaving the job
    Open pit secured before leaving the job
  • Fused pipe strung out and ready to pull
    Fused pipe strung out and ready to pull
  • Hot tap made on a live main
    Hot tap made on a live main
  • Feeding the pipe into the entry pit beside a live road
    Feeding the pipe into the entry pit beside a live road
  • Conduit pulled into the bore at the entry pit
    Conduit pulled into the bore at the entry pit
  • Fusing the pipe on site
    Fusing the pipe on site
  • Ten-inch steel gas line entering the pit at a road crossing
    Ten-inch steel gas line entering the pit at a road crossing
  • Fiber conduit run through the pit
    Fiber conduit run through the pit
  • Drilling the bore in red Carolina clay
    Drilling the bore in red Carolina clay
  • Current bore tied into the existing water main
    Current bore tied into the existing water main
  • Hand-digging to find a utility before the bore
    Hand-digging to find a utility before the bore

Let us price your next crossing

We will review your plans and come back with pricing and constructability notes.

Under, not through